USD Softball Complex – Level 10 Construction

  • 23,000 sq. ft. new softball 378 seat stadium and one-story team building
  • Scope included new switchgear, site lighting, and theatrical lighting for the softball team hype room
  • The stadium included a press box, room for concessions, stadium seating, bullpens, and sunken dugouts

Francis Parker – Level 10 Construction

  • 35,000 sq. ft. student life complex that included a two-story, two-court gymnasium with spectator seating, locker rooms, support spaces for aquatics, training room, offices, meeting spaces, and outdoor pool with bleachers
  • Included state-of-the-art lighting system, switchgear, and fire alarm system

CUSD Pacific Rim Elementary School – Bernards Bros., Inc.

  • Multi-phase campus upgrade including three new ground-up buildings

SMUSD Richland Elementary School – Balfour Beatty

  • Five new buildings including three 1-story and two 2-story buildings
  • Included 91,477 sq. ft. classroom, auditorium, library and administration space
  • New play structures, play fields, site lighting, and raised garden area

Integrity Charter School – Level 10 Construction

  • Single story building renovation and two new two-story buildings that include classrooms, administrative offices and related support areas, and a remodeled multi-purpose building

PUSD Westview High School – Balfour Beatty Construction

  • New ground up vocational classroom and campus upgrades
  • Scope included new lighting, cord reels, switchgear, BESS, fire alarm and low voltage systems

PSUSD Sunny Sands Elementary School – Bernards Bros., Inc.

  • Demo of existing buildings and full campus ground-up construction and site improvements in multiple phases
  • Increment 1 – four single story building, covered walkway, and shade structure
  • Increment 2 – MPR alterations/modernization related to kitchen, lighting, fire alarm, and site improvements

PSUSD Landau Elementary School – Bernards Bros., Inc.

  • Demo of existing buildings and full campus ground-up construction and site improvements in multiple phases
  • Increment 1 – four single story building, covered walkway, and shade structure
  • Increment 2 – MPR alterations/modernization related to kitchen, lighting, fire alarm, and site improvements

SMUSD Knob Hill Elementary – Balfour Beatty

  • Relocation of 14 relocatable classrooms and 1 relocatable restroom building with temporary site upgrades for use as interim housing

FUSD Fontana New Secondary Academy – Balfour Beatty

  • Construction of new 151,862 sq. ft. school building including new site work
  • New switchgear, lighting, and low voltage systems

VUSD Bobier Elementary School – Bernards Bros., Inc.

  • Demo of existing site infrastructure and buildings
  • New two-story administrative building, three new one-story MPR, library and storage buildings, and new photovoltaic structure

Mira Costa Community College Library – Level 10 Construction

  • Design-build library building modernization
  • Included electrical upgrades to the IT department offices, building lobby, expansion of the learning centers, new study areas, computer lab and classrooms
  • Site lighting upgrades

DMUSD Del Mar Heights Elementary School – Balfour Beatty

  • Rebuild project that included demo of existing facility, interim housing construction, and three new state-of-the-art buildings, three STEAM+ learning centers, after school innovation center, and multi-use room with a stage and kitchen
  • New switchgear, lighting, and low voltage systems